Manufacturing Settings
Manufacturing Settings holds the company-wide defaults for BOMs, Work Orders, Job Cards, and capacity planning. To open it, search for Manufacturing Settings in the search bar.
BOM and Production tab
Raw Materials Consumption
| Setting | What it does |
|---|---|
| Allow Continuous Material Consumption | Lets you consume raw materials against a Work Order several times before you record the finished goods. Use it when one production run takes days or weeks. Learn how to consume materials during production. |
| Get Raw Materials Cost from Consumption Entry | Shown when Allow Continuous Material Consumption is selected. ERPNext takes the raw material cost of the finished goods from the consumption Stock Entries. |
| Backflush Raw Materials Based On | Sets which quantities the Manufacture Stock Entry consumes. BOM consumes the BOM quantities for the quantity produced. Material Transferred for Manufacture consumes the quantities that you transferred to the Work-in-Progress Warehouse. A BOM can override this in its Consume Components section. |
| Validate Components and Quantities Per BOM | Shown when the backflush method is BOM. ERPNext stops a Material Transfer for Manufacture or Manufacture Stock Entry when an item or a quantity differs from the BOM. |
BOM
| Setting | What it does |
|---|---|
| Update BOM Cost Automatically | Updates the cost of all BOMs every day from the latest valuation rate, price list rate, or last purchase rate of the raw materials. |
| Allow Editing of Items and Quantities in Work Order | Lets you change the raw materials and quantities in a Work Order. ERPNext keeps your changes and does not reset them to the BOM. |
Alternative finished goods
Version 17
This feature is in ERPNext version 17, which is in development. ERPNext version 16 does not have it.
| Setting | What it does |
|---|---|
| Allow Alternative Finished Goods | Shows the Change Finished Item button on Work Orders, to record an approved alternative item as the output. See Record a different finished good from a Work Order. |
Overproduction for Sales and Work Order
| Setting | What it does |
|---|---|
| Overproduction Percentage For Sales Order | How much more than the Sales Order quantity you can plan for production, as a percentage. |
| Overproduction Percentage For Work Order | How much more than the Work Order quantity you can produce, as a percentage. |
Extra Material Transfer
| Setting | What it does |
|---|---|
| Transfer Extra Raw Materials to WIP (%) | How much more raw material than required you can transfer to the Work-in-Progress Warehouse against a Work Order. Use it when some material gets damaged during production. |
Job Card and Capacity Planning tab
Job Card
| Setting | What it does |
|---|---|
| Add Corrective Operation Cost in Finished Good Valuation | Adds the cost of corrective operations to the valuation of the finished goods. A corrective operation is an operation with Is Corrective Operation selected. |
| Enforce Time Logs | Makes From Time and To Time mandatory in each row of the Job Card time logs. |
| Allow Excess Material Transfer | Keeps the Material Transfer button on a Job Card after the required raw materials are transferred. |
Capacity Planning
| Setting | Default | What it does |
|---|---|---|
| Disable Capacity Planning | Cleared | Stops ERPNext from scheduling operations on workstations. The other capacity planning settings are hidden when this is selected. |
| Allow Overtime | Cleared | Lets ERPNext schedule operations outside the working hours of a workstation. |
| Allow Production on Holidays | Cleared | Lets ERPNext schedule operations on the holidays of the workstation holiday list. |
| Capacity Planning For (Days) | 30 | How many days ahead ERPNext looks for a free time slot for each operation. |
| Time Between Operations (Mins) | 0 | The gap that ERPNext keeps between two operations. |
Learn more about capacity planning.
Other Settings
| Setting | What it does |
|---|---|
| Set Operating Cost / Secondary Items From Sub-assemblies | When a Work Order uses Use Multi-Level BOM, adds the operating cost and secondary items of the sub-assembly BOMs to the finished good. |
| Make Serial No / Batch from Work Order | Creates the serial numbers or batches for the finished goods when you submit the Work Order. |
Default warehouses for production
The default Work-in-Progress, Finished Goods, and Scrap warehouses are set on the Company, in the Manufacturing section:
- Default Work In Progress Warehouse
- Default Finished Goods Warehouse
- Default Scrap Warehouse
A new Work Order takes its warehouses from these fields.
INFO
In older versions these warehouses were in Manufacturing Settings. In ERPNext v16 they are on the Company.