Manufacturing Settings ​

Manufacturing Settings holds the company-wide defaults for BOMs, Work Orders, Job Cards, and capacity planning. To open it, search for Manufacturing Settings in the search bar.

BOM and Production tab ​

Raw Materials Consumption ​

SettingWhat it does
Allow Continuous Material ConsumptionLets you consume raw materials against a Work Order several times before you record the finished goods. Use it when one production run takes days or weeks. Learn how to consume materials during production.
Get Raw Materials Cost from Consumption EntryShown when Allow Continuous Material Consumption is selected. ERPNext takes the raw material cost of the finished goods from the consumption Stock Entries.
Backflush Raw Materials Based OnSets which quantities the Manufacture Stock Entry consumes. BOM consumes the BOM quantities for the quantity produced. Material Transferred for Manufacture consumes the quantities that you transferred to the Work-in-Progress Warehouse. A BOM can override this in its Consume Components section.
Validate Components and Quantities Per BOMShown when the backflush method is BOM. ERPNext stops a Material Transfer for Manufacture or Manufacture Stock Entry when an item or a quantity differs from the BOM.

BOM ​

SettingWhat it does
Update BOM Cost AutomaticallyUpdates the cost of all BOMs every day from the latest valuation rate, price list rate, or last purchase rate of the raw materials.
Allow Editing of Items and Quantities in Work OrderLets you change the raw materials and quantities in a Work Order. ERPNext keeps your changes and does not reset them to the BOM.

Alternative finished goods ​

Version 17

This feature is in ERPNext version 17, which is in development. ERPNext version 16 does not have it.

SettingWhat it does
Allow Alternative Finished GoodsShows the Change Finished Item button on Work Orders, to record an approved alternative item as the output. See Record a different finished good from a Work Order.

Overproduction for Sales and Work Order ​

SettingWhat it does
Overproduction Percentage For Sales OrderHow much more than the Sales Order quantity you can plan for production, as a percentage.
Overproduction Percentage For Work OrderHow much more than the Work Order quantity you can produce, as a percentage.

Extra Material Transfer ​

SettingWhat it does
Transfer Extra Raw Materials to WIP (%)How much more raw material than required you can transfer to the Work-in-Progress Warehouse against a Work Order. Use it when some material gets damaged during production.

Job Card and Capacity Planning tab ​

Job Card ​

SettingWhat it does
Add Corrective Operation Cost in Finished Good ValuationAdds the cost of corrective operations to the valuation of the finished goods. A corrective operation is an operation with Is Corrective Operation selected.
Enforce Time LogsMakes From Time and To Time mandatory in each row of the Job Card time logs.
Allow Excess Material TransferKeeps the Material Transfer button on a Job Card after the required raw materials are transferred.

Capacity Planning ​

SettingDefaultWhat it does
Disable Capacity PlanningClearedStops ERPNext from scheduling operations on workstations. The other capacity planning settings are hidden when this is selected.
Allow OvertimeClearedLets ERPNext schedule operations outside the working hours of a workstation.
Allow Production on HolidaysClearedLets ERPNext schedule operations on the holidays of the workstation holiday list.
Capacity Planning For (Days)30How many days ahead ERPNext looks for a free time slot for each operation.
Time Between Operations (Mins)0The gap that ERPNext keeps between two operations.

Learn more about capacity planning.

Other Settings ​

SettingWhat it does
Set Operating Cost / Secondary Items From Sub-assembliesWhen a Work Order uses Use Multi-Level BOM, adds the operating cost and secondary items of the sub-assembly BOMs to the finished good.
Make Serial No / Batch from Work OrderCreates the serial numbers or batches for the finished goods when you submit the Work Order.

Default warehouses for production ​

The default Work-in-Progress, Finished Goods, and Scrap warehouses are set on the Company, in the Manufacturing section:

  • Default Work In Progress Warehouse
  • Default Finished Goods Warehouse
  • Default Scrap Warehouse

A new Work Order takes its warehouses from these fields.

INFO

In older versions these warehouses were in Manufacturing Settings. In ERPNext v16 they are on the Company.