Record a different finished good from a Work Order ​

Version 17

This feature is in ERPNext version 17, which is in development. ERPNext version 16 does not have it.

In process industries, such as chemicals, a Work Order sometimes produces a sellable item that differs from the planned one. For example, quality control finds a different grade or purity. The output is not scrap, but it is not the planned item either.

Change Finished Item records that the Work Order produced item B instead of item A. ERPNext creates a Stock Entry linked to the Work Order. It moves the quantity from the planned item to the actual item, keeps the production cost, and shows the real output in the Work Order Summary report.

When to use it ​

Use it when all of these are true:

  • The Work Order is submitted, and some quantity is produced.
  • An inspection found that some output is a different, sellable item.
  • The actual item is an approved alternative of the planned item.

Do not use it when:

  • The output is waste. Use scrap and secondary items.
  • You made less than planned. Use process loss.
  • You repack into other pack sizes. Use a Repack Stock Entry.

Example ​

A chemicals company runs a Work Order for 100 kg of Epoxy Resin Grade A. Quality control finds that 20 kg meets only the Grade B specification, which the company also sells.

With Change Finished Item, the supervisor converts 20 kg to Grade B. ERPNext removes 20 kg of Grade A from the finished goods warehouse and adds 20 kg of Grade B at the same production cost. The Work Order Summary shows Grade A: 80 and Grade B: 20.

Prerequisites ​

Do this setup once:

  1. In Manufacturing Settings, in the BOM and Production tab, select Allow Alternative Finished Goods.
  2. On the planned Item, select Allow Alternative Item.
  3. Create an Item Alternative for each grade that production can yield:
    • Item Code: the planned item, for example Grade A.
    • Alternative Item Code: the possible actual item, for example Grade B.
    • Two-way: select it only if Grade B Work Orders can also turn into Grade A.

Change the finished item ​

  1. Finish production as usual, so that the produced quantity is in stock.
  2. Open the Work Order and select Change Finished Item.
  3. In Actual Finished Item, select the approved alternative. If there is only one, ERPNext fills it in.
  4. In Qty to Convert, enter the quantity that is the other item. The dialog shows the quantity available to convert.
  5. Select Create Stock Entry. ERPNext opens a draft Repack Stock Entry.
  6. Enter the batch or serial numbers for both rows: the consumed batch and the new batch.
  7. Submit the Stock Entry.

Optional: open the Work Order Summary report. The Actual Finished Goods column shows the real output.

Good to know ​

  • The actual item gets the production cost of the Work Order. You do not enter a rate.
  • You cannot convert more than the produced quantity. ERPNext counts earlier conversions.
  • The converted quantity and the new item quantity must be equal. To change quantities, use a normal Repack entry.
  • You can convert in several parts, as long as the total stays within the produced quantity.
  • To undo a conversion, cancel its Stock Entry. The stock and cost return to the planned item.
  • The button and the report column show only when Allow Alternative Finished Goods is selected.

Troubleshooting ​

MessageCauseFix
Enable 'Allow Alternative Finished Goods' in Manufacturing Settings to make a finished good conversion entry.The setting is cleared.Select it in Manufacturing Settings.
Please create Item Alternative records for the item … to change the finished item.The planned item has no alternatives.Create an Item Alternative.