Manage multi-level BOMs ​

A multi-level BOM is a BOM whose components have BOMs of their own. Use it when you make sub-assemblies before the final product.

For example, a personal computer uses a hard disk and a DVD drive that you also make:

  • Personal Computer (finished good)
    • Motherboard
    • Power supply
    • Hard Disk (sub-assembly)
      • Item A, Item B, Item C
    • DVD Drive (sub-assembly)
      • Item X, Item Y, Item Z

Build a multi-level BOM ​

  1. Create and submit a BOM for each sub-assembly, starting from the lowest level.
  2. Create the BOM of the finished good. Add each sub-assembly to the Components table. ERPNext fills in the default BOM No of the sub-assembly.
  3. Submit the BOM of the finished good.

The Components table shows only the sub-assemblies. The Exploded Items tab shows every raw material of the whole tree.

Exploded Items table with the raw materials of all sub-assemblies

TIP

To build the whole tree on one screen instead, use the BOM Creator.

Plan sub-assemblies in a Work Order ​

The Work Order has a Use Multi-Level BOM checkbox. It is selected by default.

  • Selected: the Work Order plans the raw materials of the sub-assemblies. You make the whole tree in one Work Order.
  • Cleared: the Work Order uses the sub-assemblies as items. Make the sub-assemblies separately in their own Work Orders.

To keep one sub-assembly as an item while you explode the others, select Do Not Explode on its row. See the BOM options reference.

Update parent BOMs when a sub-assembly changes ​

A parent BOM links to one specific BOM of each sub-assembly. A new sub-assembly BOM does not change the parent BOM.

For example, the computer BOM BOM-PC-001 uses the hard disk BOM BOM-HDD-001. You replace Item C with Item D and create BOM-HDD-002. BOM-PC-001 still uses BOM-HDD-001, so its exploded items still show Item C.

To fix this, open the BOM Update Tool and replace BOM-HDD-001 with BOM-HDD-002. ERPNext updates every parent BOM that uses it.