Manage multi-level BOMs
A multi-level BOM is a BOM whose components have BOMs of their own. Use it when you make sub-assemblies before the final product.
For example, a personal computer uses a hard disk and a DVD drive that you also make:
- Personal Computer (finished good)
- Motherboard
- Power supply
- Hard Disk (sub-assembly)
- Item A, Item B, Item C
- DVD Drive (sub-assembly)
- Item X, Item Y, Item Z
Build a multi-level BOM
- Create and submit a BOM for each sub-assembly, starting from the lowest level.
- Create the BOM of the finished good. Add each sub-assembly to the Components table. ERPNext fills in the default BOM No of the sub-assembly.
- Submit the BOM of the finished good.
The Components table shows only the sub-assemblies. The Exploded Items tab shows every raw material of the whole tree.

TIP
To build the whole tree on one screen instead, use the BOM Creator.
Plan sub-assemblies in a Work Order
The Work Order has a Use Multi-Level BOM checkbox. It is selected by default.
- Selected: the Work Order plans the raw materials of the sub-assemblies. You make the whole tree in one Work Order.
- Cleared: the Work Order uses the sub-assemblies as items. Make the sub-assemblies separately in their own Work Orders.
To keep one sub-assembly as an item while you explode the others, select Do Not Explode on its row. See the BOM options reference.
Update parent BOMs when a sub-assembly changes
A parent BOM links to one specific BOM of each sub-assembly. A new sub-assembly BOM does not change the parent BOM.
For example, the computer BOM BOM-PC-001 uses the hard disk BOM BOM-HDD-001. You replace Item C with Item D and create BOM-HDD-002. BOM-PC-001 still uses BOM-HDD-001, so its exploded items still show Item C.
To fix this, open the BOM Update Tool and replace BOM-HDD-001 with BOM-HDD-002. ERPNext updates every parent BOM that uses it.