Create a multi-level BOM with BOM Creator ​

The BOM Creator builds a multi-level BOM on one screen. With the standard BOM form, you must create each sub-assembly BOM before the BOM of the finished good. With the BOM Creator, you build the whole tree and ERPNext creates all the BOMs for you.

BOM Creator tree with a finished good, sub-assemblies, and raw materials

Prerequisites ​

  • An Item for the finished good, each sub-assembly, and each raw material.

Build the BOM tree ​

  1. Open the BOM Creator list and select New.
  2. Enter a name, then select the Finished Good and the Quantity.
  3. Optional: select a Routing, the Rate Of Materials Based On option, and the Default Source Warehouse.
  4. Save the BOM Creator. The tree appears.
  5. In the tree, add raw materials and sub-assemblies under the finished good.
  6. To turn a raw material into a sub-assembly, select it, then select Convert to Sub-Assembly. Add its own components under it.
  7. Edit the quantities as needed.

Create the BOMs ​

Submit the BOM Creator. ERPNext creates the BOMs in a background job. The Status field shows In Progress, then Completed or Failed. If the status is Failed, the Error Log field shows the reason.

Submitting a BOM Creator