Create a multi-level BOM with BOM Creator
The BOM Creator builds a multi-level BOM on one screen. With the standard BOM form, you must create each sub-assembly BOM before the BOM of the finished good. With the BOM Creator, you build the whole tree and ERPNext creates all the BOMs for you.

Prerequisites
- An Item for the finished good, each sub-assembly, and each raw material.
Build the BOM tree
- Open the BOM Creator list and select New.
- Enter a name, then select the Finished Good and the Quantity.
- Optional: select a Routing, the Rate Of Materials Based On option, and the Default Source Warehouse.
- Save the BOM Creator. The tree appears.
- In the tree, add raw materials and sub-assemblies under the finished good.
- To turn a raw material into a sub-assembly, select it, then select Convert to Sub-Assembly. Add its own components under it.
- Edit the quantities as needed.
Create the BOMs
Submit the BOM Creator. ERPNext creates the BOMs in a background job. The Status field shows In Progress, then Completed or Failed. If the status is Failed, the Error Log field shows the reason.
