Plan asset maintenance
Machines need regular service, for example an inspection every month and a belt change every six months. A missed service can stop production. An Asset Maintenance plan lists the recurring tasks for one asset, how often each one is due, and who does it. ERPNext then creates a maintenance log for each task and reminds the assignee.
Planned maintenance is different from a repair. A repair records a failure. See Repair an asset.
Prerequisites
- The asset is submitted and has Maintenance Required selected.
- An asset maintenance team exists.
Create a maintenance plan
Open the asset and select Actions > Maintain Asset. You can also open the Asset Maintenance list and select Add Asset Maintenance.
Select the asset in Asset Name, and select the Maintenance Team.
In the Maintenance Tasks table, add a row for each task. Open the row with the edit icon to see all fields:
Field What it does Maintenance Task The name of the task, for example Monthly inspection. Maintenance Type Preventive Maintenance or Calibration. Start Date and End Date The period in which the task repeats. Periodicity How often the task is due: Daily, Weekly, Monthly, Quarterly, Half-yearly, Yearly, 2 Yearly, or 3 Yearly. Assign To The team member who does the task. Required. Certificate Required The log must have a certificate before it is complete. Description What to do. Save the plan.
ERPNext calculates the Next Due Date of each task, assigns the task to the user, and creates a planned maintenance log for it.
On the day that a task is due, the asset's status changes to In Maintenance.
Troubleshooting
No maintenance logs were created. Check the start date, end date, periodicity, and assignee of each task. Save the plan again.
A task is overdue. Complete or cancel its maintenance log. Do not only change the plan, because the missed service still needs a result.